Partial discharge (PD) is a localized dielectric breakdown which does not completely bridge the space between the two conductors.
It occurs in medium and high voltage equipment.
If allowed to progress over time, PD will result in catastrophic equipment failures in the form of explosion and fire.
Please reach us at support@powerstreamsolutions.com if you cannot find an answer to your question.
Time base maintenance is not an effective way to manage the risks associated with MV/HV equipment.
Continuous monitoring of MV/HV equipment is the most effective way to detect issues early, allowing for intervention prior to a catastrophic failure.
Estimated that 85% of catastrophic failure in HV/MV equipment is caused by PD.
Designed by ndb Technologies, the PD Annunciator System is the next generation of partial discharge monitoring. This technology is applicable for medium voltage switchgear and dry type transformers; the design allows for quick and easy installation with various sensor options.
Installation of our solution can be accomplished without the need for a system shutdown.
From push notifications based on thresholds to comprehensive cloud-based analytics, customers have the flexibility to choose the solution that aligns best with their business requirements
With the recent updates to NFPA 70B acknowledging condition-based maintenance and the implementation of 24x7 Partial Discharge Monitoring, maintenance can be decreased by as much as 40%.
PowerStream Solutions carries the full Partial Discharge product line designed, engineered and built by ndb Technologies.